Petroline Engineering
Petroline Corro Tape Applied to OLNG Pipeline

PetrolineCorro Tape

Self-fusing anti-corrosion tape system engineered for the protection and rehabilitation of onshore LNG pipelines and fittings — delivering long-lasting barrier protection in demanding field conditions.

Field-proven across OLNG installations in Southeast Asia, Petroline Corro Tape resists cathodic disbondment, soil stress, UV exposure, and chemical attack without primers or special tools.

PRODUCT APPLICATIONS

PIPELINE JOINT PROTECTION

PIPELINE JOINT PROTECTION
  • Corrosion protection at girth weld joints and pipe ends
  • Applied over FBE, 3LPE, and 3LPP coating systems
  • Used at mill or in-field before OLNG pipeline lowering-in
  • Compatible with impressed current cathodic protection systems

FIELD REPAIR & REHABILITATION

FIELD REPAIR & REHABILITATION
  • In-situ repair of damaged external coating on buried OLNG lines
  • No primers, adhesives, or special tools required for field application
  • Suitable for elbows, fittings, tees, and irregular surfaces
  • Can be applied in wet or humid field conditions

VALVE & FITTING PROTECTION

VALVE & FITTING PROTECTION
  • Wrapping of valves, flanges, and fittings in OLNG plant areas
  • Excellent conformability to complex piping geometries
  • Protects against splash zone and above-ground corrosion exposure
  • Compatible with impressed current and sacrificial anode CP systems

ABOVE-GROUND PIPE PROTECTION

ABOVE-GROUND PIPE PROTECTION
  • UV-resistant formula for above-ground OLNG piping and supports
  • Protects against moisture, humidity, and chemical attack
  • Compatible with all standard metallic pipe substrates
  • Meets AWWA C209 and NACE tape wrapping performance standards

PRODUCT FEATURES & COMPLIANCE

  • Self-fusing formulation — bonds without adhesives or primers
  • Proven resistance to cathodic disbondment (ASTM G8)
  • Soil stress and mechanical damage resistance for buried OLNG lines
  • UV and chemical resistant outer protective layer
  • Compliant with NACE RP0169 and AWWA C209 tape wrap standards
  • Temperature rated from -40°C to +80°C for OLNG service
  • Simple hand-applied wrapping — no special equipment required
Capability 1
Capability 2
Capability 3
Capability 4
Capability 5

Our Commitment

We are committed to delivering pipeline construction projects that meet the highest standards of safety, quality, and responsibility.

Zero Harm

Safety is our highest priority

Quality Assured

Built right, the first time

On-Time Delivery

Reliable execution, on schedule

Environmental Care

Minimizing impact, protecting tomorrow

Project Types

  • Greenfield Pipeline Construction
  • Brownfield Pipeline Expansion
  • Pipeline Replacement & Rehabilitation
  • Facility Piping & Interconnection
Construction Project Team

EXPERIENCED. EQUIPPED. TRUSTED.

Backed by a skilled workforce, proven methodologies, and advanced equipment, we deliver pipeline construction solutions that energize progress and build a sustainable future.